Form FM 640
TSF Routine Visual Inspection
Site
Inspection by:
Date:
/
Month
/
Day
Year
Date
Reviewed by:
Shift:
Plant Operation?
Normal
Shutdown
Weather:
Section 1 (D-Dam Pipline Operations)
PIpeline Operations
Yes
No
LST 10" Delivery Pipeline Any Leaks or Spills
HST 8" Delivery Pipeline Any Leaks or spills
Location of Opening Tailing outlets
From
To
Notes
LST 10" Spigots (10" line)
HST Pipe (6" Line)
Section 2 (D - Dam Beaching Operations)
Beaching Operations
Yes
No
Comments
Is fugitive dust being generated from any beaches?
Is the deposited HST showing signs of AMD generation
Does HST Outlet(s) need to be adjusted?
Is froth generated from HST?
Do LST Outlets need to be adjusted?
*
Yes
No
Comments
Record Tailings level (Refer Markers D3 upstream shell
Record Pond Water Level
Section 3 - (D- Dam Decanting operations)
Pond Decanting Operations
Yes
No
Comments
Is floating froth present on the pond
Are all silt curtains fixed to shoreline with no gaps
Is decant channel free from debris and froth
Is butterfly valve working
Type a question
Reading
Record water flow through V-Notch weir (cm)
Record Turbidity probe reading (IF> 35 NFU raise hazard report)
Record pH probe reading (if < 5.9 raise hazard report)
Back
Next
Dam Annotations
Annotate Image
CreatedTime
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
:
Hour
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
Minutes
Submit
Should be Empty: